The Permit Application Process
To apply for a sign permit, you’ll need to:
1.
Sign the initial document and obtain a Pre-Sign Inspection (PSI) for each sign.
2.
Submit a detailed plan showing lot dimensions, building dimensions, and the intended size and location of the sign.
3.
Provide structural plans signed by a qualified engineer or architect.
4.
Request a plan check review and submit your permit application.